The activities included various reinforcements of the fenders structures and replacement of thirteen (13) flanged risers 4”-14” of the underwater pipes, connecting the Breasting Island with the Shore terminal, along with hydrostatic tests at 28 bar. The project required the close cooperation of ROPI with specialized divers.
Restoration works on the refinery breasting island and replacement of underwater pipe risers
