The project included the construction and erection of two JP4 fuel tanks in the 113 Airforce Base of Mikra, Thessaloniki, 15 m diameter / 10 m height each, along with the installation of piping, ancillary equipment and the electrical wiring.
- +30 2310 761750
- 21 Nikitara Str., Menemeni, Thessaloniki, Greece